The complete borehole drilling process.

Twenty documented stages take a borehole from a first conversation to a handed-over water supply — and a maintenance programme that keeps it running. This is the whole sequence, published in full.

20 documented stages Full documentation pack Transparent process

The lifecycle

Every borehole follows the same documented lifecycle.

The sequence never changes, because the geology does. We survey before we drill, we test the yield before we size the pump, and we hand over the paperwork that proves it.

Stages 01 to 05 establish whether there is water and what it will cost. Stages 06 to 09 cover permissions, mobilisation and the drilling itself. Stages 10 to 14 build the borehole out and prove its capacity. Stages 15 to 20 install the equipment, connect the supply and keep it performing. Each stage has its own record, and each record travels with the borehole.

Boreholes Delivered
500+ Boreholes Delivered Across 15 African countries
Years In The Field
20 Years In The Field Continuous groundwater engineering
Success Rate
99% Success Rate On surveyed, engineered boreholes
Maximum Depth
300m Maximum Depth Rotary and percussion rigs

Stage register

All 20 stages.

Open any stage for the full method, the equipment on site, the photographs from the field and the questions we are asked most often.

Stage register unavailable

The drilling process stages are being updated. Please check back shortly.

Start your project

Ready to start your water project?

We will guide you through every one of these stages, keeping you informed at each one — and you will know exactly what you are paying for before the rig mobilises.

No obligation. Your details stay confidential.