Commercial & Industrial
Water your operation can plan around.
Factories, mines, lodges and commercial campuses need water that arrives on a schedule — not water that arrives when the grid does. We size the borehole to your actual demand and your actual cost of interruption.
The situation
Why this goes wrong for commercial sites.
Commercial sites are usually measured against a cost of interruption, not a cost of water. A factory that loses process water for four hours loses far more than the borehole ever cost. A lodge that cannot guarantee potable supply cannot guarantee its rating.
How we approach it
-
01
A demand profile built from your operating hours and head count, not a rule of thumb.
-
02
A survey that confirms the aquifer before the rig is mobilised.
-
03
Boreholes drilled to a yield that covers peak draw without over-pumping the aquifer.
-
04
Storage sized so a pump failure or an outage is an inconvenience, not a shutdown.
-
05
Water quality tested to potability, with treatment specified where the chemistry demands it.
Services that apply
The service mix for Commercial & Industrial projects.
Not every service applies to every site. These are the ones that typically make up a project of this type.
Before you ask
What buyers in this sector ask us first.
Other solutions
Different sector, same engineering standard.
Start here
Tell us about your commercial sites.
Location, water demand and intended use is enough for us to come back with the approach, a sequence and a cost — usually within one working day.
No obligation. Your details stay confidential.